NDA Special: Discretion and efficiency for a European satellite project

Hanselmann Lounges 2025 Satellite

As part of our new category "NDA Special" we offer insights into international projects that are anonymised due to confidentiality agreements. These special assignments are a central component of our global services. Week after week, our Hanselmann specialists complex installations at various locations worldwide.

Review of the first half of 2025 European satellite project

Our Cleanroom Support team delivered a very remarkable performance in the last six months of 2025.

✅ Only 36 weeks of preparation were needed to build the largest ISO class 5 cleanroom to date for a German aerospace company.
✅ All the components required for this were produced in Europe, in Germany and a large proportion within a radius of just 50 kilometres from our site.
✅ The C3 team, which had already been successful in previous projects, knew how to deal with the high demands placed on them.
✅ Complete Digital project management with our Hanselmann App.

The aerospace-specific documentation was created in cooperation with a specialist for technical documentation and a specialised engineering office.
Following successful validation, we now have a ready-made modular system with which we can build temporary cleanroom systems to ISO 5 standard in almost any size.

Success through excellence: focus on customer feedback

  • Quality of delivery/documentation: 100 %
  • Condition of the technology supplied: 100 %
  • Rework/complaints: 0 % (100 % Completion without defects)
  • Adherence to deadlines and response time: 100 %
  • Communication & flexibility: 100 %
  • Technical equipment/capacities: 100 %

Sustainability as a success factor

Holistic-Lean-Processing

  • 30 % Volume reduction for the contribution.
  • Deliveries and infeed under ISO 8 standard
  • Textile covers applied in ISO 5 environment, foil covers for transport.

These optimisations have had a lasting positive effect on resource consumption.

Efficiency in record time

After 34 weeks of preparation, the installation and commissioning at the customer's premises took place within 2 weeks.
36 weeks is a new record, 210 square metres of cleanroom space with a total height of 11000 mm and a width of 16000 mm.

Hanselmann GmbH - Your partner for international high-performance projects.

Team Hanselmann in front of JMG cranes

Hanselmann’s high customer satisfaction rating on Google

Our years of experience and customer-oriented approach ensure that our customers always expect the highest quality and reliability. This is reflected in the many positive Google reviews. See for yourself and become part of our satisfied customer base.